Friday, 29 March 2024, 8:12 AM
Site: NowLearn.net
Course: Glossary and Videos (Glossary & Videos)
Glossary: Video Collection
1

1,036 TEU cellular containership (Conmar Bay)

  

 

What you will see:

  • Cellular containership Conmar Bay
  • Built 2012
  • 151m long
  • 23m wide
  • Feeder service in Baltic region
  • Calling GTK, Gdansk, Poland

Format: normal speed
Ref: VID024

1,644 TEU cellular container ship (Maui)

 

 

 

What you will see:

  • Port of Oakland, USA
  • Early cellular container ship Maui
  • Built 1977 still operating in 2018
  • 220m long & 29m wide
  • 1,644 TEU plus 44 cars
  • 26,623 DWT
  • Close up quay crane operator cabin

Format: actual time
Ref: VID 043


10,000 TEU cellular containership (MOL Bravo)

 

 

What you will see:

MOL Bravo
Built 2014
337m long
48m wide
3 quay cranes
RTG operation

Format: time lapse high resolution

13,808 TEU cellular containership (Thalassa Tyhi)


 

   

What you will see:

  • Cellular containership Thalassa Tyhi
  • 369m long
  • 51m wide
  • 13,808 TEU capacity
  • Chartered to Evergreen for 10 years
  • At Euromax terminal, Rotterdam, Netherlands
Format: time lapse

Ref: VID 026



8

8,501 TEU container ship (COSCO VIETNAM)

 

 

What you will see:

  • Cellular container ship (COSCO Vietnam)
  • Euromax Terminal, Rotterdam
  • COSCO Vietnam
  • Built 2011
  • 8,501 TEI
  • 334m long & 43m wide
Format: time lapse
Ref: VID 039

8,600 cellular container ship (NYK Venus)

  






864 TEU geared cellular container ship (Concordia)

 

 


What you will see:

  • Geared cellular container ship 
  • Concordia
  • Built 1997
  • 846 TEU capacity (232 TEU reefer)
  • 22m wide
  • ECT Delta Terminal, Rotterdam

Format: time lapse

Ref: VID 040


9

9,600 TEU cellular container ship (Cap San Antonio)

  

 

What you will see:

  • Cellular containership Cap San Antonio
  • Built 2014
  • 333m long & 48.2m wide
  • Maximum draft 14m
  • 9,600 TEU (4,200 TEU reefer)
  • ECT Delta Terminal, Rotterdam
  • 2 bunker barges alongside (HFO & diesel oil)

Format: time lapse
Ref: VID 042 


A

Approach channel (Melbourne)

 

 

 

What you will see:

  • Navigation up the Yarra River, Melbourne, Australian
  • Airdraft restriction at West Gate Bridge
  • Melbourne, Australian
  • Berthing at Webb Dock East
  • Opened 1969
  • Max vessel 335m long, 42.8m wide & 13m draft

Format: time lapse

Ref: VID 041


C

Container trucks on public road

 

   

What you will see:

  • Public road outside terminal gates
  • Flow of traffic and workers
  • Container trucks
  • Tractor trailer
  • Wide variety of container sizes and types
Format: time lapse
Ref: Container Trucks

cRMG main yard

 

   

What you will see:

  • cRMGs
  • Remote operation
  • Telescopic spreader extending
  • Lifting 20ft
  • Lifting 40ft
  • Tractor trailer

Format: time lapse
Ref: VID 002
D

Dredger (trailer hopper suction)


 

 

What you will see:

  • Maintenance dredging at ECT Delta Terminal, Rotterdam
  • Suction hopper dredger (Hein)
  • 107m long
  • 15.5m wide
  • Hopper capacity 3,656 cubic meters
Format: actual time 
Ref: VID 035

Dry bulk container (3MBG)



What you will see:

  • 30ft dry bulk container
  • Roof loading hatches
  • Rear end cat flap
  • Size type code 3MBG
  • Reach stacker
  • Truck driver engaging twist locks

Format: actual time

Ref: VID033

E

Empty handler at night

 

   

What you will see:

  • Empty handler
  • Night time loading
  • Loading truck with 40ft container
Format: time lapse

Ref: VID 012

Empty handler lifting 2 x 40ft containers


 

 

What you will see:

  • Empty handler
  • Containerships Terminal, Helsinki
  • Vertical lift 2 x 40ft empty containers
  • Servicing truck delivering empty container
Format: time lapse

Ref: VID 027


H

Hatch cover (lifting on)

 

 

What you will see:

  • Ship Maui, Matson Line
  • Built 1978 (video taken 2015)
  • Oakland port, USA
  • Lift off hatch cover being lifted on
  • Deck hand spotting for quay crane operator
Format: actual time 
Ref: VID 036
L

Lashing cage (two tier)

 

 

What you will see:

  • 2 tier lashing cage operation
  • Euromax terminal, Rotterdam
  • Cellular container ship COSCO Vietnam
  • Disengaging twist locks
  • Reefer stacks

Format: actual time
Ref: VID 045


M

Mobile harbour cranes

 

 

 What you will see:

  • 3 different mobile harbour cranes
  • Handling a 40ft container
  • Loading a MAFI with steel coils
  • Moving along a quayside
Format: actual time

Ref: VID 029 



O

OOCL Germany 20,413 TEU

From mid march we will host a weekly educational video blog based on a 3 minute time-lapse - click below for a preview

 

           
P

Push barge unloading by layer

 

     

What you will see:

  • Layer unloading of push barge
  • RTGs
  • Tractor trailers
  • Double stack tractor trailers

Format: time lapse
Ref: VID 008
R

Railhead cRMG with rotating spreader

  

    

What you will see:

RSC railhead Rotterdam
cRMG working trains, trucks and stack
Rotating spreader
Tank containers
Swapbodies

Format: time lapse
Ref: VID025


River terminal (bi-modal crane)

 

  

What you will see:

  • Alpherium river terminal, Netherlands
  • Bi-modal crane working barge and stack
  • Reach stacker
  • Empty handler
Format: time lapse
Ref: VID 031



S

Ship departing berth (reversing)

 

   

What you will see:

  • Ever Delight
  • Departing berth in reverse
  • Tug assistance
  • Turning 180 degrees

Format: time lapse

Ref: VID 011

Ship departing Singapore

 

   

What you will see:

  • Day time departure
  • Turning ship 180°
  • Approach channel
  • Complex navigation
  • Busy shipping lane
  • Ships waiting at anchor

Format: time lapse

Ref: VID 003

Ship loading (bay view)

 

   

What you will see:

  • Single bay unloaded
  • Above & below deck
  • Remove hatch covers
  • Deckhands working
  • Unloading
  • 40ft general purpose
  • 40ft platform

Format: time lapse

Ref: VID 006

Ship loading (between legs)

 

   

What you will see:

  • Tractor trailers
  • Double stack tractor trailers
  • Day and night loading
  • Twin 20fts general purpose
  • 40ft general purpose
  • 40ft tank (liquid gas)

Format: time lapse 

Ref: VID 004

Ship loading (twin 20fts)

 

   

What you will see:

  • Tractor trailers
  • Double stack tractor trailers
  • Loading
  • Twin 20ft general & reefer
  • 40ft general purpose
  • 40ft platform

Format: time lapse 

Ref: VID 005

Straddle carrier (1 over 2)


 

 

What you will see:

  • Straddle carrier (one over two)
  • Steveco, Vuosaare Terminal, Helsinki
Format: actual time

Ref: VID 028


STS Cranes booming down

  

    

What you will see:

  • Conti Canberra (5,600 TEU)
        - 5 STS cranes booming down
        - Start of operations
  • Ever Delight (4,200 TEU)
        - No containers above deck
        -  Loading under deck

Format: time lapse

Ref: VID 009


T

Tank and bulk containers by rail

 

   

What you will see:

Container train in Rotterdam
23 general purpose containers
36 tank containers
4 dry bulk containers

Format: double speed




Tank container 20ft (22T7)

 

 
 

What you will see:

  • 20ft tank container
  • Pressurised to 910kPa
  • Dangerous gasses
  • Size type code 22T7
  • Cargo methyl chloride (flammable gas)
Format: actual time 
Ref: VID 034

Truck stop gate out (morning rush hour)

 

 

What you will see:

  • Morning rush hour at truck stop
  • Maasvlakte Plaza 
  • 357 parking spaces
  • 35 trailer spaces
  • Reefer plugs
  • 24/7 operation
  • Secure gate in and gate out

Format: time lapse
Ref: VID 044



U

Unstuffing 20ft general purpose - aggregates

      


What you will see:

  • 20ft general purpose container
  • Unstuffing bulk aggregate
  • Wooden bulkhead & gravity discharge

Format: real time
Ref: VID 020

Unstuffing 45ft general purpose container

 

 


What you will see:

  • 45ft general purpose container
  • High cube contaimer
  • Manual unstuffing
  • Retail warehouse

Format: time lapse
Ref: VID 021

Unstuffing reefer container in the open

 

 

What you will see:

  • Singapore wholesale market
  • 40ft high cube reefer container
  • Unstuffing boxed vegetables
  • Palletising and shrink wrapping
Format: actual time 
Ref: VID 030


X

xRTG main stack at night - high resolution

xRTG main stack at night - low resolution

xShip working - feeder loading at night - high resolution

xShip working - feeder loading at night - low resolution

xShip working (unloading geared feeder)